Equipment maintenance three-level maintenance system

1. The three-level maintenance of the equipment is divided into daily maintenance, first-level maintenance and second-level maintenance.
2. The daily maintenance of the equipment is carried out by the operator after the shift before the shift, and the oil filling and maintenance of each part is made. The equipment is clean and non-staining, and every shift is required.
3. The first-level maintenance of the equipment is mainly based on the operator. The maintenance worker assists in the partial disintegration of the equipment, inspects the relevant parts of the cleaning, clears the oil passages, and fastens the various parts of the equipment. The time is generally 500 hours after the cumulative operation. get on.
4. The secondary maintenance of the equipment is mainly for maintenance workers, and the operators participate. Partial disassembly inspection and repair of the equipment, partial recovery inspection of the lubrication system, oil change cleaning, electrical repair repair inspection. The operation was performed once after 2,500 hours.
5. All equipment must implement the system of fixed person fixed voucher. Any newly added equipment operators should be trained to obtain an operation permit before they can be employed.
6, the implementation of the maintenance package mechanism, so that maintenance personnel and operators combined, responsible for maintaining and maintaining the equipment.
7. The third-level maintenance of the equipment should be recorded while doing.