China Mobile South Base Phase I Project

Project Name: China Mobile South Base Phase I Project Area: Guangdong Progress Phase: Filing Construction Period: March 2012-December 2014 Major Equipment: Fire-fighting facilities, security facilities, water supply and drainage facilities, cranes, excavators, ventilation facilities Lighting facilities. (for reference only)
Project Profile: The project is located in Tianhe Software Park, Gaotang Road, Tianhe District, Guangzhou, and Phase 1 of China Mobile South Base with a scale of 36,0000.00 square meters. The main buildings include R&D center, IT support center, industrial gathering center and administrative auxiliary housing. Covers an area of ​​17,8000.0 square meters. The total investment of the project is 294.38 million yuan.
Construction Unit: China Mobile Communications Group Guangdong Co., Ltd. Postal address: South of 6th Floor, Building 1.2, China Mobile South Base, No. 333 Gaotang Road, Tianhe District, Guangzhou Postcode: 510640 Contact person: Xu Zhikai Telephone Fax
Related Developments: Tower Crane Infrastructure Project

Mine High Strength Chain

Mine high strength chain

Our fatory G80/G40 Log boom chain . Our main products include lifting chain,lashing chain, anchor chain,mine chain,ship chain,bucket elevator chain,stainless chain,etc.

Application fields: Mine, transportation
Material containing Cr material: 9:28, Ni, Mo of high quality alloy ,Q195/Q235
An intensity level: grade B, C, D level level
Painted surface treatment: Leaching paint, Black, Galvanized ,

QUALITY:
According to GB/T12718-2009 and Polish standard PN-G-46701:1997,which fulfils the requirements of the following specifications:ISO-610-1990(E),DIN22252:2001-09.

High Strength Minning Round -Link Chains


Mining High Strength Round Link Chain, G80 Chain, Harvesters Three-ring Chain, Mine High Strength Chain, Short Link Chain

Hebei Fangyu Trade Co., Ltd. , https://www.filtersmaterial.com