Beijing Lenovo Science and Technology Park Phase II D-Sale Site Project

Project Name: Project for D-Region Vendors in Phase II of Lenovo Technology Park in Beijing (May 2011 - July 2012, 250 million)
Region: Beijing Progress: Construction starts Construction cycle: May 2011 - July 2012 Major equipment: cranes, fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation facilities, and lighting facilities. (for reference only)
Project Description:
The project is located at 3rd Street, Zhongguancun, Haidian District, Beijing. It is a comprehensive development with a total area of ​​11,000 square meters, including office, supporting facilities, and parking lot. The total investment of the project is 250 million yuan.

Construction Unit: Beijing Rongke Zhidi Real Estate Development Co., Ltd. Postal address: Rongke Consulting Center, No. 2 South Academy of Sciences, Zhongguancun, Haidian District, Beijing Postcode: 100090
Contact: Meng Xianzhong Telecommunication, 13910691703, 010-62509246

Construction unit: Beijing Rongke Zhidi Real Estate Development Co., Ltd. Postal address: Room 307, Building A, No. 2 Academy South Road, Haidian District, Beijing Zip Code: 100080
Contact: Zhang Danzhen, Telecommunication

Design Unit: Beijing Yigong Building Decoration Engineering Co., Ltd. Postal address: 1908, Building 15, Jianwai Street, Beijing
Postal Code: 100022
Contact: Zhang Lei Telephone, 58872800
Fax

Related news: Tower crane Infrastructure information

Tyre Steel Drawer

Steel-drawer

Model:XY-P80 XY-p120

Specification:

The Steel-drawer pull out the whole bar, the sidewall because of the role of the pull mouth,promoting rubber tearing, smoothly separate wire and rubber.

Steel-drawer

Advantages:

1.This equipment adopts double vane pump to supply oil, low working noise, at the same time to ensure the speed and pressure of the drawing cylinder when working, and improve the working efficiency and the service life of the valve.

2.The automatic lifting device is adopted to reduce the labor intensity of workers;

3.The inner guide rail positioning, make sensor reliability retractor positioning highly accuracy, drawing cylinder operation smoothly.

4.Using manual automatic exchange of work,flexible choice.

Tyre Steel Remover ,Tyre Horizontal Steel Drawer,Tyre Steel Lateral Drawer

Shangqiu Jinpeng Industrial Co., Ltd. , https://www.recyclingthewaste.com