Aerospace Heavy Industry delivers the first batch of new mine energy products for mines, mines and green mines

On November 26th, the Aerospace Heavy Equipment Co., Ltd. (referred to as Aerospace Heavy Industry) military-civilian fusion products and the first batch of new energy 5 tons explosion-proof electric trackless rubber wheel material transport vehicles (explosion-proof electric material vehicles) lined up with a vast and tidy team. The service to the mining area marked a new era in China's Jinggong Mining Green Mine's new energy products.

航天重工交付全球首批井工矿绿色矿山新能源产品
Aerospace Heavy Industry delivers the world's first batch of wells, mines, green mines and new energy products

It is understood that in January 2015, after the successful development of the company's explosion-proof electric material vehicle, it achieved industrial trial operation in China's Shenhua Coal Mine Group's Daliuta Mining Area, which aroused extensive attention and repercussions from the industry and mainstream media. The product has the advantages of “zero emission, low energy consumption, low noise, low failure, long life, and easy maintenance” and solves the existing mine explosion-proof diesel vehicles “high pollution, high fuel consumption, high noise, high failure, and low life. The short boards such as “Difficult to maintain” have been praised by the industry and experts as “a milestone modern green mine’s environmental smart auxiliary transport equipment” and “allow underground workers to breathe the same air as the ground”.

In December 2016, the product passed the appraisal of safety applicability organized by the State Coal Supervision Bureau and the scientific and technological achievements appraisal of the China Coal Industry Association. The product has reached the international level as a whole. It has not only become the current domestic domestic certificate product with mass production qualification, but also has become The Shenhua Group's "build a zero-emission green mine" iconic product. On October 11, 2017, this product won the bid for Shenhua Group in batches, winning a total of 58 units.

It is reported that the explosion-proof electric material vehicles delivered this time a total of 12 units, the remaining 46 units will be gradually handed over to the user's hands, for the Shenhua Group to create a "green mine", "smart mine" to provide strong support.

Related Developments: Aerospace Heavy Industry Mining New Energy

Mixing And Stirring Equipment

Mixing Stirring Equipment,Stirring Machine,Stirrer Mixer,Chemical Mixing Stirrer

Wuxi Mingyan Equipment Co., Ltd , https://www.wxmygroup.com